BSNL

Good bye BSNL (AS9829) | New link at home!

A blog post dedicated to BSNL AS9829. It just tried so hard to become as irrelevant as it can from everyone’s life (and that doesn’t excludes me now).   So what really is BSNL btw?

  • A Govt of India telco sitting at a extensive fiber of over 600,000 Kms across the country (staying just unused and unavailable for anyone’s use!)
  • A telco which has an extensive last mile copper (which is very poorly maintained and barely works!)
  • A backbone with over 200Gbps of IP transit capacity (which completely sucks due to rotten routing)
  • An integrated telecom provider offering services from landline to DSL broadband, from leased line to datacenter services! (out of which everything fails miserably from product line to technical ground level operations)
  • An extensive manpower (which is terribly arrogant and from top to ground level staff anyone barely works!)
  • Although telecom industry just boomed, it went from 10,000 crore profits in 2004 to 8000 crore losses in 2015. And still politics goes around it!
  • While private sector was busy with focus on 4G LTE deployment, BSNL’s market share dropped below 10% in 2014
  • While private sector firms like Sterlite, Radius Infratel focused on FTTH rollouts, BSNL rolled out FTTH plans for 4000 INR/month for 50GB cap and FUP speed of (amazing) 512Kbps to ensure no one uses it
  • While Reliance Jio is about to come, Airtel is extensively launching 4G LTE, cool companies like ACT are getting more investment, BSNL is putting 6000 crore in public wifi infrastructure to give few mins of free wifi and with hop of users paying it afterwards. (Wow?!)

All above tells nothing but ways in which BSNL is 100% screwed up for now. I don’t expect it to ever pick up again. Politically, technically, and fundamentally it’s a mess. I became BSNL broadband user in 2008 and it has been over 7 years of (painful and terrible) experience with them. As a company which put so much of infrastructure to connect India worked extremely hard to do as many stupid things as possible. For me trouble remained that in my city they were only wired telecom provider for retail services.   Last month I got a long haul circuit from Airtel (provisioned on fiber) between my city and a friend’s ISP PoP for 10Mbps bandwidth. Circuit is delivered at a Airtel BTS site location (slightly away from my home) and I have installed Microtik SXT Lite 5’s shooting link from there to my home (around 1km link with clear LoS). This is a usual long range fixed wireless RF link over un-licensed 5.8Ghz band. (Thankyou govt. of India for delicensing it in 2007 and making available for public use). Thanks to companies like Microtik and Ubiquiti for opening up world of good fixed wireless radios and antennas which really work great and are available for quite good prices. I got pair of SXT Lite5’s from Amazon.in at 7700 INR (~$116). Fortunately BTS site has a private WISP tower and the owner of tower agreed to let me use his tower for my radio for reasonable price.    

BSNL AS9829 - A rotten IP backbone

Today I met a good friend and he has recently moved back into Rohtak (like me!) and was crying over BSNL’s issues. He has issues of unstable DSL due to last mile and I told him that even if last mile works well, BSNL still has got ton of issues with their IP backbone traffic.   It’s Sunday late night out here in India and I am having really pathetic connectivity with just everywhere except Google. With Google only key difference I noted is that my TCP session to Google’s services is terminating at Mumbai and not Delhi anymore. First and formost, I did trace to spectranet.in (which is last company I was working for) to see how is my latency with server hosting it:

NOFN and some thoughts

Today I came across a nicely written article in Business Standard on NOFN. Article’s title was “NOFN: A distant dream”. I must say it is one of good articles I have seen so far on the topic and most of other articles appeared to be factually incorrect and more like Press Releases of UPA.  

Some key points from the Business Standard article:

According to a top official at the Department of Telecommunications (DoT), the project was conceptualised without a proper study. “NOFN would connect 2.5 lakh villages from the block level. But, no study was done on the details on optic fibre still the Block level, and how healthy those fibres are. Experts say that the NOFN project does not include service offering. It is just about the laying of optic fibres. For end-to-end services, service providers will have to set up their own infrastructure at the gram panchayat level. While the initial cost was projected at Rs 20,000 crore for the NOFN project, private companies will need to pump in much more than this amount to offer services to end customers.

BSNL - Softlayer connectivity problem & possible fix

It’s late night here in India. I am having final 8th semester exams and as usual really bored! 

Though this time we have interesting subjects but still syllabus is pretty boring spreading across multiple books, notes and pdf’s. Anyways I will be out of college after June which sounds good.

Tonight, I found a routing glitch. Yes a routing glitch!! :)

These issues somehow keep my life in orbit and give a good understanding on how routing works over the Internet.